FSFabShopSource

How to Write a Fabrication Shop Quote

A step-by-step way to write a metal fabrication quote: scope, material takeoff, labor hours, markup, exclusions and terms, so every job is priced the same.

A good fabrication quote does two jobs. It prices the work so you make money, and it tells the customer exactly what they are getting so there are no arguments later. This guide walks through a repeatable way to build a quote for custom metal work, from the first drawing to the document you send.

1. Pin down the scope

Most quoting problems start with a fuzzy scope. Before you price anything, write down:

If the customer only has an idea, a quick sketch helps both of you. The DXF designer can lay out simple plate parts so you can confirm sizes and hole locations before you price.

2. Do a material takeoff

List every piece of steel by shape, size, length and quantity. Then nest it into the stock lengths you actually buy, adding kerf and trim for every cut. The cut list optimizer tells you how many sticks to order, and the steel weight calculator gives the weight if your supplier prices by the pound or CWT. Add hardware, consumables you charge per job, and any outside services such as plating, coating or laser cutting. Get current prices from your suppliers; steel prices move.

The steel estimating guide covers takeoffs in more detail.

3. Estimate labor by operation

Guessing a total number of hours is where shops lose money. Break the job into the steps it will actually go through and estimate each one:

  1. Layout and programming
  2. Cutting (saw, plasma, shear)
  3. Drilling, punching and bending
  4. Fit-up and tacking
  5. Welding
  6. Grinding and cleanup
  7. Finish prep and coating, if in house
  8. Loading, delivery and installation

Compare your estimate with the actual hours on similar past jobs. If you track actual time on every job, your estimates get better each month. Multiply total hours by your shop rate; if you have not worked one out, see how to calculate a shop rate.

4. Add markup the right way

Decide how you mark up and do it the same way on every quote. A common approach is to mark up material and outside services to cover handling, waste and risk, and to charge labor at a shop rate that already includes overhead and profit. Be clear on the difference between markup and margin: a 25% markup is not a 25% margin. The markup vs margin guide explains the math.

Quote total = material cost + markup on material + (labor hours x shop rate)

The free quote builder follows this structure: enter your material cost, markup percentage, labor rate and hours, and it totals the job.

5. Write the exclusions and assumptions

This section protects you more than any other. Spell out what is not included, for example:

Also list assumptions: site access, working hours, who supplies power on site, and the drawing revision you priced.

6. Set terms and an expiration date

State payment terms, any deposit you require before buying material, and how long the price is good. Because material costs change, a short validity window is common for steel work. Say how changes are handled once the job is underway.

7. Send a clean, readable document

A quote on your letterhead with a clear description, a total, exclusions and terms looks more professional than a number in a text message, and it gives the customer something to approve in writing. Keep a copy of every quote with the cost breakdown behind it, so you can see later which jobs made money. Quote Builder Pro saves quotes, itemizes multiple parts and produces branded PDFs if you want that done for you.

Quick checklist

SectionCheck
ScopeParts, quantities, drawing revision, finish, install or not
MaterialNested into stock lengths, current supplier prices, hardware, outside services
LaborHours by operation, compared with past jobs, at your shop rate
MarkupApplied the same way every time
ExclusionsEngineering, permits, field work, changes
TermsDeposit, payment, expiration date, change orders

Frequently asked questions

What should a metal fabrication quote include?

A clear scope with quantities and drawing revision, material and finish, price, lead time, exclusions, assumptions, payment terms and an expiration date. Keep the cost breakdown for your own records.

How long should a fabrication quote be valid?

There is no fixed rule. Because steel prices change, many shops keep the validity window short and state it on the quote, then re-check material prices before accepting a late approval.